Pmp (R) / Capm (R) Exam Prep: A Basic Guide to Activity-On-Node and Critical Path Method - Jayanta K. Das Purkayastha - Kirjat - Booklocker Inc.,US - 9781614345046 - maanantai 31. lokakuuta 2011
Mikäli Kansi ja otsikko eivät täsmää, on otsikko oikein

Pmp (R) / Capm (R) Exam Prep: A Basic Guide to Activity-On-Node and Critical Path Method 1st edition

Hinta
€ 23,99

Tilattu etävarastosta

Arvioitu toimitus ma 26. tammi - ke 4. helmi
Lisää iMusic-toivelistallesi
tai

A thorough and in-depth preparation guide for PMP® and CAPM® exams covering Precedence Diagramming Method/Activity-On-Node concepts and their analysis using Critical Path Method. This guide explains the concepts with illustrated examples with emphasis on special situations. Explanation of concepts through stepwise solved examples will provide readers hands-on ability for their application. This guide will serve as a launch pad for advanced study in this area beyond the requirements of the two exams.


118 pages, black & white illustrations

Media Kirjat     Paperback Book   (Kirja pehmeillä kansilla ja liimatulla selällä)
Julkaisupäivämäärä maanantai 31. lokakuuta 2011
ISBN13 9781614345046
Tuottaja Booklocker Inc.,US
Sivujen määrä 118
Mitta 178 × 256 × 11 mm   ·   217 g
Kieli Englanti