Vinkkaa tuotetta kavereillesi:
Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution Khalid S. Al-gahtani
Tilattu etävarastosta
Joululahjoja voi vaihtaa 31.1. asti
Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution
Khalid S. Al-gahtani
At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, because it can affect the project time and risk as a result of float consumption by the owner and the contractor(s). The current Project Management (PM) software is used as a tool only to manage the project time, cost, and resources without the ability to determine the project delay, acceleration, or float consumption responsibilities that frequently cause the construction projects ending up in litigations. This Book has investigated the delay analysis techniques, and attempted to solve all of the identified weaknesses in analyzing the float ownership and consumption, acceleration impacts, and the effect of concurrent delays. In addition, it studies the current PM software in analyzing delay claim. Finally, a computer programming is introduced to use in analyzing delay claim. If you would like to understand and study the delay analysis techniques in depth, this is the right book to choose.
| Media | Kirjat Paperback Book (Kirja pehmeillä kansilla ja liimatulla selällä) |
| Julkaisupäivämäärä | maanantai 13. joulukuuta 2010 |
| ISBN13 | 9783843350709 |
| Tuottaja | LAP LAMBERT Academic Publishing |
| Sivujen määrä | 324 |
| Mitta | 226 × 18 × 150 mm · 476 g |
| Kieli | Englanti |