Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution - Khalid S. Al-gahtani - Kirjat - LAP LAMBERT Academic Publishing - 9783843350709 - maanantai 13. joulukuuta 2010
Mikäli Kansi ja otsikko eivät täsmää, on otsikko oikein

Construction Delay Analysis Techniques: Technique Comparison, Float Analysis, and It Solution

Hinta
€ 71,49

Tilattu etävarastosta

Arvioitu toimitus ke 29. heinä - to 6. elo
Saat ilmoituksen artistin Khalid S. Al-gahtani uusista julkaisuista
Lisää iMusic-toivelistallesi
tai

Ei vielä arvioitu

At the present time, we do not have universally accepted method to precisely determine the construction project delays, their causes or responsibilities. The float ownership is another vague issue and deserves up front assignment, because it can affect the project time and risk as a result of float consumption by the owner and the contractor(s). The current Project Management (PM) software is used as a tool only to manage the project time, cost, and resources without the ability to determine the project delay, acceleration, or float consumption responsibilities that frequently cause the construction projects ending up in litigations. This Book has investigated the delay analysis techniques, and attempted to solve all of the identified weaknesses in analyzing the float ownership and consumption, acceleration impacts, and the effect of concurrent delays. In addition, it studies the current PM software in analyzing delay claim. Finally, a computer programming is introduced to use in analyzing delay claim. If you would like to understand and study the delay analysis techniques in depth, this is the right book to choose.

Media Kirjat     Paperback Book   (Kirja pehmeillä kansilla ja liimatulla selällä)
Julkaisupäivämäärä maanantai 13. joulukuuta 2010
ISBN13 9783843350709
Tuottaja LAP LAMBERT Academic Publishing
Sivujen määrä 324
Mitta 226 × 18 × 150 mm   ·   476 g
Kieli Englanti