Risk Management As a Project Management Challenge: Evaluation of Risk Factors and Strategies in Schedule Delays and Cost Overruns: a Study from the Perspective of Industrial Projects in Peru - Fany Arroyo - Kirjat - LAP LAMBERT Academic Publishing - 9783844316957 - tiistai 26. huhtikuuta 2011
Mikäli Kansi ja otsikko eivät täsmää, on otsikko oikein

Risk Management As a Project Management Challenge: Evaluation of Risk Factors and Strategies in Schedule Delays and Cost Overruns: a Study from the Perspective of Industrial Projects in Peru

Fany Arroyo

Hinta
SFr. 41,49

Tilattu etävarastosta

Arvioitu toimitus ma 29. syys - ti 7. loka
Lisää iMusic-toivelistallesi
Eller

Risk Management As a Project Management Challenge: Evaluation of Risk Factors and Strategies in Schedule Delays and Cost Overruns: a Study from the Perspective of Industrial Projects in Peru

In general, project success is usually measured in terms of scope, time, cost, and quality. In addition, critical risks factors are also related to scope, time, cost, and quality, as well as the risk strategies. Projects in industrial sectors in Peru are not exceptions. The stable Peruvian economy has attracted important public and private investments such that the number of industrial projects has increased considerably during the last decade. Despite this attractive context, industrial projects are failing to achieve their objectives due to schedule delays and cost overrun problems. The objective of this research is to identify and evaluate the critical risk factors that cause these schedule delays and cost overrun problems, as well as determine effective strategies for the avoidance of risks. The perception of Peruvian project participants in this research regarding risk management is quite fundamental for our assessment. A comparison with the perception of project participants from other countries is also a contribution to this research.

Media Kirjat     Paperback Book   (Kirja pehmeillä kansilla ja liimatulla selällä)
Julkaisupäivämäärä tiistai 26. huhtikuuta 2011
ISBN13 9783844316957
Tuottaja LAP LAMBERT Academic Publishing
Sivujen määrä 84
Mitta 150 × 5 × 226 mm   ·   143 g
Kieli German