Cmos Low Power Analysis: Scaling Effect & Power Delay Analysis - Vijay Sharma - Kirjat - LAP LAMBERT Academic Publishing - 9783844382778 - keskiviikko 1. kesäkuuta 2011
Mikäli Kansi ja otsikko eivät täsmää, on otsikko oikein

Cmos Low Power Analysis: Scaling Effect & Power Delay Analysis

Vijay Sharma

Hinta
€ 44,49

Tilattu etävarastosta

Arvioitu toimitus ke - to 1. - 9. loka
Lisää iMusic-toivelistallesi
tai

Cmos Low Power Analysis: Scaling Effect & Power Delay Analysis

In this thesis leakage reduction techniques like stack forcing, multiple threshold CMOS, variable threshold CMOS are explored, that mitigate leakage in circuits, operating in the active mode at various temperatures. Also, implications of technology scaling on the choice of techniques to mitigate total leakage are closely examined. The result is guidelines for designing low-leakage circuits in nanometer technology nodes. Logic gates in the 180nm, 130nm, 100nm and 70nm technology nodes are simulated and analyzed. Here delay analysis of various logic circuits are also examined.

Media Kirjat     Paperback Book   (Kirja pehmeillä kansilla ja liimatulla selällä)
Julkaisupäivämäärä keskiviikko 1. kesäkuuta 2011
ISBN13 9783844382778
Tuottaja LAP LAMBERT Academic Publishing
Sivujen määrä 100
Mitta 150 × 6 × 226 mm   ·   167 g
Kieli German  

Näytä kaikki

Lisää tuotteita Vijay Sharma