Julkaisut sisältäen U.s. Nuclear Regulatory Commission

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Final Supplemental Environmental Impact Statement for Combined Licenses (Cols) for Vogtle Electric Generating Plant Units 3 and 4: Final Report (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Safety Evaluation Report Related to Disposal of High-level Radioactive Wastes in a Geologic Repository at Yucca Mountain, Nevada Volume 1: General Information (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Review of Responses to Nrc Bulletin 2003-02-leakage from Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Main Report (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Appendices a Through L (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Verification & Validation of Selected Fire Models for Nuclear Power Plant Applications: Volume 1 (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Standard Review Plan for Renewal of Spent Fuel Dry Cask Storage System Licenses and Certificates of Compliance (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Criteria for Preparation and Evaluation of Radiological Emergency Response Plans and Preparedness in Support of Nuclear Power Plants Guidance for Protective Action Strategies (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Estimating Loss-of-coolant Accident (Loca) Frequencies Through the Elicitation Process Appendices a Through M (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · A Nonparametric Statistical Methodology for the Design and Analysis of Final Status Decommissioning Surveys (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Safety Evaluation Report Related to the License Renewal of Nine Mile Point Nuclear Station, Units 1 and 2 (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Loss of Control of Cesium-137 Well Logging Source Resulting in Radiation Exposures to Members of the Public (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Re-evaluation of the Indoor Resuspension Factor for the Screening Analysis of the Building Occupancy Scenario for Nrc's License Termination Rule (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Aging Assessment of Safety-related Fuses Used in Low-and Medium-voltage Application in Nuclear Power Plants (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Safety Evaluation Report: Related to the License Renewal of Turkey Point Nuclear Plan, Units 3 and 4 (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Standard Review Plan for the Review of a Reclamation Plan for Mill Tailing Sites Under Title II of the Uranium Mill Tailings Radiation Control Act of 1978 (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Some Observations on Risk-informing Appendices A&b to 10 Cfr Part 50: Prepared for the Adversory Committee on Reactor Safeguards (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Fitness for Duty in the Nuclear Power Industry: an Update of Technical Issues on Drugs of Abuse Testing and Fatigue Management (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Effects of Degradation on the Severe Accident Consequences for a Pwr Plant with a Reinforced Concrete Containment Vessel (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Consolidated Guidance About Materials Licenses: Program-specific Guidance About Licenses Authorized Distribution to General Licensees (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Consolidated Guidance About Materials Licenses: Applications for Sealed Source and Device Evaluation and Registration: Draft Report for Comment (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Reliability of Ultrasonic In-service Inspection of Welds in Reactor Internals of Boiling Water Reactors (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Supplement 49, Regarding Limerick Generating Station, Units 1 and 2 (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Preliminary Performance-baes Analysis Relevant to Dose-based Performance Measures for a Proposed Geologic Repository at Yucca Mountain (Pehmeäkantinen suo) (2014)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Environmental Impact Statement for Combined Licenses (Cols) for Comanche Peak Nuclear Power Plant Units 3 and 4 (Nureg-1943, Vol. 2) (Pehmeäkantinen suo) (2011)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Safety Evaluation Report Related to the License Renewal of Palo Verde Nuclear Generating Station, Units 1, 2, and 3 (Pehmeäkantinen suo) (2011)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Final Supplemental Environmental Impact Statement for Combined Licenses (Cols) for Vogtle Electric Generating Plant Units 3 and 4 (Pehmeäkantinen suo) (2011)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Environmental Impact Statement for the Proposed Eagle Rock Enrichment Facility in Bonneville County, Idaho- Final Report: Appendices a Through I (Nureg-1945, Vol. 2) (Pehmeäkantinen suo) (2011)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Environmental Impact Statement for the Proposed Eagle Rock Enrichment Facility in Bonneville County, Idaho- Final Report: Chapters 1 Through 10 (Pehmeäkantinen suo) (2011)

Pehmeäkantinen suo

U.s. Nuclear Regulatory Commission

Kansikuva: U.s. Nuclear Regulatory Commission · Cable Response to Live Fire (Carolfire) Volume 3: Thermally-induced Electrical Failure (Thief) Model (Pehmeäkantinen suo) (2008)

Pehmeäkantinen suo