Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Main Report - U.s. Nuclear Regulatory Commission - Kirjat - CreateSpace Independent Publishing Platf - 9781500611279 - tiistai 22. heinäkuuta 2014
Mikäli Kansi ja otsikko eivät täsmää, on otsikko oikein

Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Main Report

U.s. Nuclear Regulatory Commission

Hinta
S$ 36,30

Tilattu etävarastosta

Arvioitu toimitus ke 29. loka - pe 7. marras
Lisää iMusic-toivelistallesi
tai

Feasibility Study for a Risk-informed and Performance-based Regulatory Structure for Future Plant Licensing: Main Report

The purpose of this NUREG is to establish the feasibility of developing a risk-informed and performance-based regulatory structure for the licensing of future nuclear power plants (NPPs). As such, this NUREG documents a ?Framework? that provides an approach, scope and criteria that could be used to develop a set of requirements that would serve as an alternative to 10 CFR 50 for licensing future NPPs; however, this Framework is not the entire process. It is an initial phase in is to demonstrate the feasibility of such a concept, recognizing that for full implementation there will be outstanding programmatic, policy, and technical issues to be resolved. As such, this feasibility study does not represent a staff position, but rather a significant piece of research. The second phase, which involves implementation, is comprised of several, iterative steps: resolution of issues, development of draft requirements and regulations, pilots and tests, and rulemaking.

Media Kirjat     Paperback Book   (Kirja pehmeillä kansilla ja liimatulla selällä)
Julkaisupäivämäärä tiistai 22. heinäkuuta 2014
ISBN13 9781500611279
Tuottaja CreateSpace Independent Publishing Platf
Sivujen määrä 182
Mitta 216 × 279 × 10 mm   ·   435 g
Kieli English  

Näytä kaikki

Lisää tuotteita U.s. Nuclear Regulatory Commission